![]() Sucar, “Building information modelling framework: A research and delivery foundation for industry stakeholders,” Autom. Paavalo, “Beyond the BIM utopia?: Approaches to the development and implemetation of building information modelling,” Autom. ![]() Al Husaini, “Analisa Pemahaman Mahasiswa Arsitektur Tentang Metode Building Information Modelling (BIM) Untuk Mendukung Revolusi Industri 4.0 Bidang Konstruksi di Provinsi Riau,” Pros. Soeharto, Manajemen Proyek dari konseptual sampai operasional, 1st ed. ![]() Najwa, “Graph Database Modelling on Malay Architecture IFC Data,” no. ěani Noor Muchamad and Ira Mentayani, “Model Pelestarian Arsitektur Berbasis Teknologi Informasi Studi Kasus: Arsitektur Tradisional Suku Banjar,” Dimens. Kuswoyo, “Analisis Penggunaan Renovation Tools BIM Dalam Proyek Dalam Proyek Konstruksi Di Kabupaten Kampar,” vol. ICOMOS, “Charter for the Conservation of Places of Cultural Significance,” Australia, 1982. Indonesia, “Undang-Undang Republik Indonesia Nomor 11 Tahun 2010 Tentang Cagar Budaya.” p. Al Husaini, “Morphological Characteristic of Pulau Belimbing Village in Riau Province, Indonesia,” vol. Al Husaini, Prinsip Arsitektur Tropis Pada Rumah Tradisional Melayu Uma Kabuong Limo Dengan Pemodelan Metode Building Information Modelling (BIM), 1st ed.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |